Gemba Report List

No Finding Date HAC Description Status Action
1057 2026-05-27 CCR Crusher Frame monitor di area CCR Crusher kotor dan berdebu Done View
1058 2026-05-27 312-bc3 cleaning penempelan chute outlet Done View
1059 2026-05-27 332-WF2 Penempelan material silika di chute outlet, cleaning done Done View
1060 2026-05-27 332-EW1 Cat ulang checkhole ew Done View
1061 2026-05-27 332-EW1 Cleaning body ew done Done View
1062 2026-05-27 332-EW1 cleaning platform ew sisi selatan barat Done View
1063 2026-05-27 332-EW1 cleaning lantai ew sisi timur done Done View
1064 2026-05-27 332-EW1 Cat ulang body ew sisi barat atas Done View
1065 2026-05-27 332-EW1 Repaint body ew sisi barat Done View
1066 2026-05-27 L62-WF1 belt drift ke arah barat, kencangkan kawat pengikat steering roller sisi timur, belt kembali center Done View
1067 2026-05-27 412-PG2 Jalur aerasi vd ada material, drain aerasi beberapa menit selanjutnya keluar angin Done View
1068 2026-05-27 L62-RM1 Box seal air sisi utara material dalam box penuh, cleaning done Done View
1069 2026-05-27 L62-YA2 yard reject hampir nyundul chute, ratakan reject dan basahi dengan air done Done View
1070 2026-05-27 L62-RM1 Cleaning box seal airfan sisi selatan, akumulasi material dalam box tidak banyak Done View
1071 2026-05-27 562-LQ1 level oli rendah Done View
1072 2026-05-27 D36 - PV2 Baut kotor dan aus Done View
1073 2026-05-27 X91 bc 3 Cleaning Done View
1074 2026-05-27 X91 bc3 Cleaning & Painting Done View
1075 2026-05-27 X91 bc 3 Cleaning & Painting Done View
1076 2026-05-27 X91 bc 3 Cleaning dan pengecatan Done View
1077 2026-05-27 471-GQ1 REPAIR PLATE AERATION COOLER Done View
1078 2026-05-15 442-EH1 Description : Ganti pinion gear main motor Action : 15/5/26 442-EL1 Ganti pinion gear main motor - prepare tools - done - reposisi lift bareng tim elektrik untuk bebaskan pinion gear dari frame lift - done - lepas connection kabel motor by tim elektrik - done - install hamparan scaffolding & hanger untuk angkur point lepas GB & motor by tim scaffold - done - kunci & tahan posisi lift dg lever block 1 ton kanan kiri - done - lepas cover motor - done - lepas cover pinion gear - continue Done View
1079 2026-05-14 ruang hidrosol Description : Aktifasi sistim hidrosol Action : 1. Motor mixer pump : Kabel Motor mixer pump di connect, ketika di run bisa berfungsi. 2. Motor filling : pressure switch rusak dan fungsi pompa tidak bisa, namun motor bisa running tanpa pressure switch. Oli pompa juga sudah keruh. 3. Motor spray : berfungsi normal saat lokal maupun remote Done View
1080 2026-05-14 311-RE1 Description : 311-RE1 Check & repair reclaimer system Action : Update job mech crusher RMP 1. Area 312-RE1 - persiapan permit dan tools - install lototo - repair bucket putus no 31 - tightening baut roller kendor no. 27,23 - welding support crack no. 29,33,34,5,6 - release lototo - test run dengan team patrol - beres kan alat dan kembali kan ke ccr Note : job belum kepegang replace bushing scrapper pecah no, 18,11 sisi barat Team: pak Syarif, pak turdianto Done View
1081 2026-05-18 K11-BC2 Description : K11-BC2 Replace carry roller no.1 tail tngh Action : K11-BC2 Replace carry roller no.1 tail tengah Done View
1082 2026-05-27 Saluran rawmill Tuban 2 Saluran kotor Done View
1083 2026-05-27 lift AFR Tuban 2 Saluran kotor Done View
1084 2026-05-27 Depan MO Sign tertutup tanaman Done View
1085 2026-05-18 K11-BC1 Description : K11-BC1 Replace impact roller no.38 head tngh Action : K11-BC1 Replace impact roller no.38 head tengah Done View
1086 2026-05-18 K11-BC3 Description : K11-BC3 Replace rubber skirt timur Action : 1. Persiapan permit dan tools 2. Kontak CCR dan instal lototo 3. Bongkar Rubber skirt yang aus sepanjang 1400mm 4. Marking Rubber skirt 5. Install rubber skirt yang baru 6. Release lototo dan kembalikan ke ccr Done View
1087 2026-05-26 461-KL1 Description : 461-KL1 Refill Greasing Thrust Roller Action : Top up Grease pump dan cek putaran pompa normal Done View
1088 2026-05-27 taman kantor jety Sign tertutup tanaman Done View
1089 2026-05-20 211-BC1 Description : Sayat top rubber Action : Lototo Sayat top bc yang mengelupas Done View
1090 2026-05-20 L21-BC2 Description : Return roller no.18,21 stack Action : - Replace return roller no 18,21 >Done Done View
1091 2026-05-20 451-TV4 Description : Casing duct redspot Action : - Ukur boxstone dim. 500x400 - Fabrikasi boxstone >Done - Pasang angkur >Done - Install boxstone >Done > Priyono, Warsito Done View
1092 2026-05-20 452-PR1 Description : Check dan tambal area redspot Action : - cek kondisi di lokasi - sketch kebutuhan plat penambal - fabrikasi plat - transfer plat & tools ke lokasi - setting posisi plat doubling - tambal redspot Man power: P. Jupri, P. Bambang Done View
1093 2026-05-27 392 FA5 Kawat menggantung potensi menyangkut helm dan baju kerja Done View
1094 2026-05-15 491-AC1 Description : 491-AC1 Rewelding rail utara Action : Repair sambungan welding pada frame support rail utara nomor 42 paling atas / head, sudah tersambung dan tidak oblak saat running Tim : Priyono, Warsito Done View
1095 2026-05-27 Atap kantor project jetty Atap kotor potensi air merembes kedalam atap Done View
1096 2026-05-27 L62-BF1 DP naik, check membran banyak yang pecah Done View
1097 2026-05-27 462-KI1 INLET KILN Cleaning slidingwall dinding barat agak lumayan tebal akumulasi penempelan coatingnya Done View
1098 2026-05-21 X92-3B1 Description : X92-3B3 Tambal inlet chute sisi selatan Action : - check lokasi, ukur dan potong plat untuk dubling - setting plat dubling dan full weld - cat dengan warna abu abu SJU: Ismono, WIdodo Done View
1099 2026-05-27 462-KI1 INLET KILN Cleaning kiln inlet Done View
1100 2026-05-21 332-AF1 Description : Lepas bobokan atas chute inlet AF Action : - Bin X92-3B2 blocking matrial tidak mau turun diisi laterite dan copper slag 1:1 - buka plat bobokan atas AF untuk mengatasi blokingan SJU: Sutaji, Santo Done View
1101 2026-05-27 462-KI1 Cleaning kiln inlet TQ2 Done View
1102 2026-05-27 462-KI1 Cleaning coating sliding sisi dinding selatan ex IKGA Done View
1103 2026-05-27 L62 - BF1 ganti membran purging pecah dan sovek compartemen 10 no 8 Done View
1104 2026-05-27 L62 - BF1 ganti membran purging pecah dan sovek compartemen 11 no 7 Done View