| No | Finding Date | HAC | Description | Status | Action |
|---|---|---|---|---|---|
| 577 | 2026-06-12 | Raw Mill TQ1 | floor sisi timur area Raw Mill TQ1 banyak debu dan sampah | Done | View |
| 578 | 2026-06-12 | Raw Mill TQ1 | Floor area at Raw Mill TQ1 banyak sampah berceceran | Done | View |
| 579 | 2026-06-12 | Raw Mill TQ1 | banyak sampah dibawah tangga floor Raw Mill TQ1 | Done | View |
| 580 | 2026-06-05 | 332 - BC1 | Penempelan material di chute outlet lumayan tebal | Done | View |
| 581 | 2026-06-05 | 361 - BE1 | Body area head bolong | Done | View |
| 582 | 2026-06-05 | 361 - BE1 | Body bolong di area head | Done | View |
| 583 | 2026-06-05 | 361 - MS1 | Agenda idle raw mill cleaning MS | Done | View |
| 584 | 2026-06-05 | 362 - BE1 | Idle agenda cleaning bottom BE | Done | View |
| 585 | 2026-06-09 | 441 - AB1 no 21 | Pipa AB red spot | Done | View |
| 586 | 2026-06-09 | 461 - KL1 P1 | Sensor draft buntu | Done | View |
| 587 | 2026-06-10 | 441 - AB1.C4 | AB 44 lt tiga ngowos ngisi terus | Done | View |
| 588 | 2026-06-10 | V91 - FV1 | Flapper gagal open | Done | View |
| 589 | 2026-06-10 | L61 - RM1 Y2 | SG3 tidak bisa open karena piston pneumatik lepas | Done | View |
| 590 | 2026-06-10 | 461 - KL1 | Inlet kiln coating banyak | Done | View |
| 591 | 2026-06-10 | L61 - RM1 | Monitor SG3 reject coal tidak bisa open karena piston pneumatik lepas | Done | View |
| 592 | 2026-06-11 | V91 - BC1 | After hot work area AFR | Done | View |
| 593 | 2026-06-11 | L61 - WF1 | Sounding belt WF coal | Done | View |
| 594 | 2026-06-11 | L61 - RM1 | Box sealing air material lumayan banyak | Done | View |
| 595 | 2026-06-12 | 461 - KL1 | Inlet kiln coating besar | Done | View |
| 596 | 2026-06-12 | L61-RM1 | Box sealing air material lumayan banyak | Done | View |
| 597 | 2026-06-12 | Stockpile Coal | ada smoldering di pile coal | Done | View |
| 598 | 2026-06-05 | 442-SM1 | Safety: Tutup sampler hot meal lepas. Bahaya material panas menyembur keluar. Tutup kembali. OK. | Done | View |
| 599 | 2026-06-11 | 462-2V1 | Ganti filter CAFU kamera burner | Done | View |
| 600 | 2026-06-11 | 472-FA4 | Tightening koneksi sensor temperatur | Done | View |
| 601 | 2026-06-11 | 472-FA3 | Tightening koneksi sensor temperatur | Done | View |
| 602 | 2026-06-11 | 472-FA5 | Tightening koneksi sensor temperatur | Done | View |
| 603 | 2026-06-11 | 472-FA8 | Tightening koneksi sensor temperatur | Done | View |
| 604 | 2026-06-11 | 472-FA7 | Tightening koneksi sensor temperatur | Done | View |
| 605 | 2026-06-11 | Gudang AFR | Penggantian cover apar | Done | View |
| 606 | 2026-06-10 | 361-RM1 | Quickfix casing hot gas posisi belakang cek hole meal chute bolong untuk sementara ditambal silikon | Done | View |
| 607 | 2026-06-07 | K11-ST1 | material sensing stacker kotor dan pergerakannya seret | Done | View |
| 608 | 2026-06-07 | K91-MW1 | MW gagal pindah arah TQ2 | Done | View |
| 609 | 2026-06-07 | K91-HP1 | outlet hopper blocking | Done | View |
| 610 | 2026-06-07 | 562-3B1 | bin reject gantung | Done | View |
| 611 | 2026-06-06 | K11-ST1 | material sensing stacker error, material hampir sundul | Done | View |
| 612 | 2026-06-06 | K91-MW1 | MW gagal pindah arah TQ2 | Done | View |
| 613 | 2026-06-03 | 512-LA1 | pengeluaran klinker dari offspec TQ2 lambat | Done | View |
| 614 | 2026-06-03 | 562-3B1 | check hole bin kondisi terbuka, potensi material keluar | Done | View |
| 615 | 2026-06-04 | 562-FN1 | Railling kusam dan berdebu | In Progress | View |
| 616 | 2026-06-04 | 562-FN1 | Warna cat pada guarding pudar dan berdebu | Done | View |
| 617 | 2026-06-10 | 662-PM1 | Merapikan material spare yg ada di utara packer L2 | Done | View |
| 618 | 2026-06-10 | 661 PM1 | Merapikan timbel after kalibrasi | Done | View |
| 619 | 2026-06-10 | 671 - PA1 | Membersihkan material scrap after PM | Done | View |
| 620 | 2026-06-09 | Laboratory | Face shield untuk sampling buram | Done | View |
| 621 | 2026-06-09 | 332-BC1 head | Kardus bekas sparepart di platform | Done | View |
| 622 | 2026-06-09 | 332-BC1 tail | Sarung tangan bekas di tangga | Done | View |
| 623 | 2026-06-09 | 312-3B1 | Cleaning inside bin EW | Done | View |
| 624 | 2026-06-09 | 313-3B1 | Cleaning inside bin premix | Done | View |